Southern Wayne High School
THE SCHOOL WANTED THE ABSOLUTE BEST HARDWOOD FLOOR POSSIBLE
Categorie
Metri quadrati
1400 m2
Contraente
The Sports Flooring Group (TSFG)
Nazione
Stati Uniti d'America
Posizione
North Carolina
The Sports Flooring Group (TSFG) was tired assisting schools in their selection, then losing projects to the lowest bidder, especially with “me too” look-alike unfinished maple systems.
In this case, TSFG met with the school district and architect, and developed a customized venting subfloor system with the 7/8” Junckers beech sports floor on top. TSFG insisted the school add the requirement of a 20 year warranty. This precluded low ball contractors from supplying other products, and allowed TSFG to make the sale and provide an excellent floor system for the school.
TSFG is known for their exquisite art work and attention to detail. The red court boarder was created with a red tint direct onto the sanded Junckers surface.
The jump circle logo is stunning.